Centennial Park Outdoor Pool Restoration

The Municipality seeks a Contractor to perform 1) concrete restoration work; 2) apply a Thermo Plastic Coating system to the entire pool basin, walls, top edges and ramp; 3) removal of existing low and high diving board platforms and bases, as outlined in the “Scope of Work” section resulting in a longer-lasting solution that reduces maintenance and operating costs providing a quality durable finish.
The Municipality of Brockton looks to have the Centennial Park Pool Restoration completed by September 30, 2020