Joe Allore Bridge Replacement

Work of the contract includes, but is not necessarily limited to the following: removal of existing bridge structure, construction of new concrete foundations, installation of pre-engineered modular steel girder bridge, reconstruction of the bridge approaches included the installation of steel beam guide rail.

Tender documents may be obtained for no fee in the attached PDF or from www.tweed.ca.

Lowest or any tender not necessarily accepted.

Questions about this tender, please direct to the engineer, Matt MacDonald, P.Eng., Project Manager, Jewell Engineering Inc. ([email protected] or 613-969-1111).

Submissions will be accepted until March 1, 2022 at 2:00 pm by Manager of Public Works, Allan Broek. Public bid opening will be held as close to after 2:00 pm on the day of tender closing in the Council Chambers.